CCNP Training
CCNP TRAINING TIMETABLE (DURATION-2 WEEKS)
START (MM/DD/YY) | END | DAYS | TIME | LOCATION |
---|---|---|---|---|
APRIL 2017 | ||||
04/03/17 | 04/14/17 | M,T,W,T,F | 10:00 - 16:00 | London |
04/17/17 | 04/28/17 | M,T,W,T,F | 10:00 - 16:00 | London |
04/08/17 | 05/13/17 | Saturday | 13:00 - 19:00 | London |
MAY 2017 | ||||
05/01/17 | 05/12/17 | M,T,W,T,F | 10:00 - 16:00 | London |
05/15/17 | 05/26/17 | M,T,W,T,F | 10:00 - 16:00 | London |
05/20/17 | 05/24/17 | Saturday | 13:00 - 19:00 | London |
JUNE 2017 | ||||
06/05/17 | 06/16/17 | M,T,W,T,F | 10:00 - 16:00 | London |
06/19/17 | 06/30/17 | M,T,W,T,F | 10:00 - 16:00 | London |
JULY 2017 | ||||
07/03/17 | 07/14/17 | M,T,W,T,F | 10:00 - 16:00 | London |
07/17/17 | 07/28/17 | M,T,W,T,F | 10:00 - 16:00 | London |
07/01/17 | 07/08/17 | Saturday | 13:00 - 19:00 | London |
AUGUST 2017 | ||||
08/07/17 | 08/18/17 | M,T,W,T,F | 10:00 - 16:00 | London |
08/12/17 | 08/09/17 | M,T,W,T,F | 10:00 - 16:00 | London |
08/21/17 | 08/16/17 | Saturday | 13:00 - 19:00 | London |
SEPTEMBER 2017 | ||||
08/21/17 | 09/01/17 | M,T,W,T,F | 10:00 - 16:00 | London |
09/04/17 | 09/15/17 | M,T,W,T,F | 10:00 - 16:00 | London |
09/18/17 | 09/29/17 | M,T,W,T,F | 10:00 - 16:00 | London |
09/23/2017 | 10/28/2017 | Saturday | 13:00 - 19:00 | London |
OCTOBER 2017 | ||||
10/02/17 | 10/13/17 | M,T,W,T,F | 10:00 - 16:00 | London |
10/16/17 | 10/27/17 | M,T,W,T,F | 10:00 - 16:00 | London |
NOVEMBER 2017 | ||||
11/06/17 | 11/17/17 | M,T,W,T,F | 10:00 - 16:00 | London |
11/20/17 | 12/01/17 | M,T,W,T,F | 10:00 - 16:00 | London |
11/04/17 | 12/09/17 | Saturday | 13:00 - 19:00 | London |
DECEMBER 2017 | ||||
12/04/17 | 12/15/17 | M,T,W,T,F | 10:00 - 16:00 | London |
12/18/17 | 12/29/17 | M,T,W,T,F | 10:00 - 16:00 | London |
Course Description
CCNP Exam 300-101: CISCO ROUTE
– Network resources needed for implementing EIGRP on a network
– Create an EIGRP implementation plan, EIGRP verification plan
– Configure EIGRP routing
– Verify EIGRP solution was implemented, Use show and debug commands
– Document results of EIGRP implementation and verification
– Create an EIGRP implementation plan, EIGRP verification plan
– Configure EIGRP routing
– Verify EIGRP solution was implemented, Use show and debug commands
– Document results of EIGRP implementation and verification
– Determine network resources needed for implementing OSPF on a network
– Create an OSPF implementation plan, OSPF verification plan
– Configure OSPF routing
– Verify OSPF solution was implemented properly using show and debug commands
– Document results of OSPF implementation and verification plan
– Create an OSPF implementation plan, OSPF verification plan
– Configure OSPF routing
– Verify OSPF solution was implemented properly using show and debug commands
– Document results of OSPF implementation and verification plan
– Determine network resources needed for implementing eBGP on a network
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
– Determine network resources needed for implementing IPv6 on a network
– Create an IPv6 implementation plan, IPv6 verification plan
– Configure IPv6 routing
– Configure IPv6 interoperation with IPv4
– Verify IPv6 solution was implemented properly using show and debug commands
– Document results of IPv6 implementation and verification plan
– Create an IPv6 implementation plan, IPv6 verification plan
– Configure IPv6 routing
– Configure IPv6 interoperation with IPv4
– Verify IPv6 solution was implemented properly using show and debug commands
– Document results of IPv6 implementation and verification plan
– Create a redistribution implementation plan based upon the results of the redistribution analysis
– Create a redistribution verification plan
– Configure a redistribution solution
– Verify that redistribution was implemented
– Document results of a redistribution implementation and verification plan
– Identify the differences between implementing an IPv4 and IPv6 redistribution solution
– Create a redistribution verification plan
– Configure a redistribution solution
– Verify that redistribution was implemented
– Document results of a redistribution implementation and verification plan
– Identify the differences between implementing an IPv4 and IPv6 redistribution solution
– Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
– Create a Layer 3 path control verification plan
– Configure Layer 3 path control
– Verify that a Layer 3 path control was implemented
– Document results of a Layer 3 path control implementation and verification plan
– Implement basic teleworker and branch services
– Describe broadband technologies
– Configure basic broadband connections
– Describe basic VPN technologies
– Configure GRE
– Describe branch access technologies
– Create a Layer 3 path control verification plan
– Configure Layer 3 path control
– Verify that a Layer 3 path control was implemented
– Document results of a Layer 3 path control implementation and verification plan
– Implement basic teleworker and branch services
– Describe broadband technologies
– Configure basic broadband connections
– Describe basic VPN technologies
– Configure GRE
– Describe branch access technologies
CCNP Exam 300-101: CISCO ROUTE
– Determine network resources needed for implementing a VLAN based solution on a network
– Create a VLAN based implementation plan
– Create a VLAN based verification plan
– Configure switch-to-switch connectivity for the VLAN based solution
– Configure loop prevention for the VLAN based solution
– Configure Access Ports for the VLAN based solution
– verify the VLAN based solution was implemented properly using show and debug commands
– Document results of VLAN implementation and verification
– Create a VLAN based implementation plan
– Create a VLAN based verification plan
– Configure switch-to-switch connectivity for the VLAN based solution
– Configure loop prevention for the VLAN based solution
– Configure Access Ports for the VLAN based solution
– verify the VLAN based solution was implemented properly using show and debug commands
– Document results of VLAN implementation and verification
– Determine network resources needed for implementing a Security solution
– Create a implementation plan for the Security solution
– Create a verification plan for the Security solution
– Configure port security features
– Configure general switch security features
– Configure private VLANs Configure VACL and PACL
– Verify the Security based solution was implemented properly using show and debug commands
– Document results of Security implementation and verification
– Create a implementation plan for the Security solution
– Create a verification plan for the Security solution
– Configure port security features
– Configure general switch security features
– Configure private VLANs Configure VACL and PACL
– Verify the Security based solution was implemented properly using show and debug commands
– Document results of Security implementation and verification
– Determine network resources needed for implementing eBGP on a network
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
– Determine network resources needed for implementing a Switch based Layer 3 solution
– Create an implementation plan for the Switch based Layer 3 solution
– Create a verification plan for the Switch based Layer 3 solution
– Configure routing interfaces Configure Layer 3 Security
– Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
– Document results of Switch based Layer 3 implementation and verification
– Create an implementation plan for the Switch based Layer 3 solution
– Create a verification plan for the Switch based Layer 3 solution
– Configure routing interfaces Configure Layer 3 Security
– Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
– Document results of Switch based Layer 3 implementation and verification
– Implement a Wireless Extension of a Layer 2 solution
– Implement a VoIP support solution
– Implement video support solution
– Implement a VoIP support solution
– Implement video support solution
– Determine network resources needed for implementing High Availability on a network
– Create a High Availability implementation plan
– Create a High Availability verification plan
– Implement first hop redundancy protocols
– Implement switch supervisor redundancy
– Verify High Availability solution was implemented properly using show and debug commands
– Document results of High Availability implementation and verification
– Create a High Availability implementation plan
– Create a High Availability verification plan
– Implement first hop redundancy protocols
– Implement switch supervisor redundancy
– Verify High Availability solution was implemented properly using show and debug commands
– Document results of High Availability implementation and verification
CCNP Exam 300-135: CISCO TSHOOT
– Develop a plan to monitor and manage a network
– Perform network monitoring using IOS tools
– Perform routine IOS device maintenance
– Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer
– Perform network monitoring using IOS tools
– Perform routine IOS device maintenance
– Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer
– Multi Protocol system networks
– EIGRP
– OSPF
– eBGP
– routing redistribution solution
– a DHCP client and server solution
– NAT
– first hop redundancy protocols
– IPv6 routing
– IPv6 and IPv4 interoperability
– switch-to-switch connectivity for the VLAN based solution
– loop prevention for the VLAN based solution
– Access Ports for the VLAN based solution
– private VLANS
– port security
– general switch security
– VACL and PACL
– switch virtual interfaces (SVIs)
– switch supervisor redundancy
– switch support of advanced services (i.e., Wireless, VOIP and Video)
– a VoIP support solution
– a video support solution
– Layer 3 Security
– issues related to ACLs used to secure access to Cisco routers
– configuration issues related to accessing the AAA server for authentication purposes
– security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)
– EIGRP
– OSPF
– eBGP
– routing redistribution solution
– a DHCP client and server solution
– NAT
– first hop redundancy protocols
– IPv6 routing
– IPv6 and IPv4 interoperability
– switch-to-switch connectivity for the VLAN based solution
– loop prevention for the VLAN based solution
– Access Ports for the VLAN based solution
– private VLANS
– port security
– general switch security
– VACL and PACL
– switch virtual interfaces (SVIs)
– switch supervisor redundancy
– switch support of advanced services (i.e., Wireless, VOIP and Video)
– a VoIP support solution
– a video support solution
– Layer 3 Security
– issues related to ACLs used to secure access to Cisco routers
– configuration issues related to accessing the AAA server for authentication purposes
– security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)
– Determine network resources needed for implementing eBGP on a network
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan
– Create an eBGP implementation plan
– Create an eBGP verification plan
– Configure eBGP routing
– Verify eBGP solution was implemented properly using show and debug commands
– Document results of eBGP implementation and verification plan